This week we finally managed to refurbish the toilet – made possible by a generous donation.
Everything was pulled out on Monday, and Mark levelled the floor. On Tuesday we filled all the holes, painted it top-to-bottom, and replaced the light. On Wednesday the new toilet, sink, and floor were fitted.
The two things left to do are tiling around the sink, and fitting some skirting.